PEMEX is shuffling their feet, stalling and buying time over the criticism that no apparent forward progress has been forthcoming from their lips.
Sort of reminds me of what isn't happening with the final stretch of Mex 40-D, between Durango and Villa Union. The bridge concrete needs to sit unloaded for 5 months after being poured. So this means what, May?
Sort of reminds me of what isn't happening with the final stretch of Mex 40-D, between Durango and Villa Union. The bridge concrete needs to sit unloaded for 5 months after being poured. So this means what, May?