Thanks for the responses. CDOT website indicates 34 should be open on 5/25. If 36 is the heavier traveled then maybe we should stick with 34. Our MH is challenged just going up the grades in Western NC. Between the climb up the Rockies and the altitude, we're probably going to be more a moving obstruction!
We're coming in from the East on I70 on a Fri afternoon. I'll take another look at the Peak to Peak route and decide.
Busskipper, I'm not brave enough the tackle Trail Ridge in the MH...hope to do it several times in the Bug though!LOL
Thanks again,
Gary