Forum Discussion
David_and_Chris
May 25, 2016Explorer
As of 05/24/2016 Construction right lane between exit 21 and 22. This road was repaved at the top of the hill Northeast bound after Exit 23.
David
David
About Bucket List Trips
13,488 PostsLatest Activity: Aug 08, 2016