Forum Discussion
ACZL
May 15, 2019Explorer
js218 wrote:
My rig took 6 months to built to my specifications, all wiring in conduit, all plumbing is 1/2" swagelok S.S.tubing and flex joints with full port ball valves insulated and heat traced. Six inches blue board in roof and floor, 3.5" in walls and slides. They can build it but you have to find a company willing to work with you.
And a very large piggybank as it sounds like a nice rig and large rig to tow it (like a class 8 truck).
About Fifth Wheel Group
19,006 PostsLatest Activity: Jan 13, 2025