Forum Discussion
BillyBob_Jim
May 15, 2019Explorer
ACZL wrote:js218 wrote:
My rig took 6 months to built to my specifications, all wiring in conduit, all plumbing is 1/2" swagelok S.S.tubing and flex joints with full port ball valves insulated and heat traced. Six inches blue board in roof and floor, 3.5" in walls and slides. They can build it but you have to find a company willing to work with you.
And a very large piggybank as it sounds like a nice rig and large rig to tow it (like a class 8 truck).
He might not need the large tow rig for a Super C but good for him and his piggybank. A 45' Haulmark is a long ways away from a $35K Coachmen 5th wheel slapped together by some Amish pieceworkers.
About Fifth Wheel Group
19,027 PostsLatest Activity: Nov 07, 2025