Forum Discussion
Old-Biscuit
Jul 19, 2013Explorer III
Leave the pin box/hitch were it is.
Jack trailer up via frame to unload suspension then move spring eye down one hole in shackles....should raise trailer 2-3". That's what the extra holes are for.
(I removed tires, used a bottle jack to control axle and did one side at a time)
I did mine 5 yrs. ago to level rig and maintain bedrail clearance...worked great.
Also installed 'wet' bolt kit at same time
Jack trailer up via frame to unload suspension then move spring eye down one hole in shackles....should raise trailer 2-3". That's what the extra holes are for.
(I removed tires, used a bottle jack to control axle and did one side at a time)
I did mine 5 yrs. ago to level rig and maintain bedrail clearance...worked great.
Also installed 'wet' bolt kit at same time
About Fifth Wheel Group
19,006 PostsLatest Activity: Jan 29, 2025