So the past few weeks have been a little crazy - I've only been able to work on this thing about one day a week... But I have made some progress! :)
This is the start of the ceiling. In the other pictures it looks awful at the moment... But once I get the trim over the seams it'll look good. I had to screw lathe to the beams across the ceiling to fasten everything to.

Copper sink I picked up

The beginning of the nose... I framed up each side and installed the lights along with a 6x9 speaker on either side. I honestly don't like the way the speakers look - so those may get changed sometime in the future. Also got all my puck lights in!

I removed the window frames and cut out paneling to go around the edges before I framed up the wall to go on either side of the nose area... Then framed up a little 2x wall that I covered with the leather.. Then framed around the window with some cedar.

This is the start of the ceiling. In the other pictures it looks awful at the moment... But once I get the trim over the seams it'll look good. I had to screw lathe to the beams across the ceiling to fasten everything to.

Copper sink I picked up

The beginning of the nose... I framed up each side and installed the lights along with a 6x9 speaker on either side. I honestly don't like the way the speakers look - so those may get changed sometime in the future. Also got all my puck lights in!

I removed the window frames and cut out paneling to go around the edges before I framed up the wall to go on either side of the nose area... Then framed up a little 2x wall that I covered with the leather.. Then framed around the window with some cedar.

About Fifth Wheel Group
19,020 PostsLatest Activity: Jul 18, 2025