Thanks for the comments. It was a difficult task. The coroplast had to come out to work on the frame portion and did that after a catastrophic tank leak which prompted a replacement and discovery of an absolute installation mess of all the wiring, plumbing and hydraulic lines (which is a whole other story). So, this was a 3 phase project that has been going on since late October. Actually led to insulating with R19 and installation of on board air and automatic reel. Fall and winter were very busy with it. Pretty good weather allowed for it. Even squeezed in a week trip last month too.