Forum Discussion
garyp4951
Feb 22, 2017Explorer III
Just using recycled milling would be a mistake since it will never harden up. A new hot asphalt mix with just a percentage of milling added is fine, and almost all new roads have a small percentage of recycled milling added to the mix.
If you use the hot asphalt paving, the base must be compacted dirt, or gravel.
Crushed concrete makes a good gravel surface, and is comparable to a limestone driveway, but a little less in cost. All gravel surfaces need maintenance time to time, and do not need as much base prep as the asphalt.
If you use the hot asphalt paving, the base must be compacted dirt, or gravel.
Crushed concrete makes a good gravel surface, and is comparable to a limestone driveway, but a little less in cost. All gravel surfaces need maintenance time to time, and do not need as much base prep as the asphalt.
About Fifth Wheel Group
19,007 PostsLatest Activity: Feb 28, 2025