Forum Discussion
fulltimin
Jun 01, 2020Nomad
After a couple of false starts today, I finally did get to the motor home and managed to get the frame glued and nailed to the plywood shelving area.
I did need to add a little support in the center up at the ceiling while waiting for the construction adhesive to cure.
Had a bunch of other stuff going on today, and as usual, getting the frames installed took longer than I was hoping for.

That means the mower isn't fixed, the yard isn't mowed, and the face frame on the passenger side isn't installed either. Lol...
Hope your week is off to a great start!
I did need to add a little support in the center up at the ceiling while waiting for the construction adhesive to cure.
Had a bunch of other stuff going on today, and as usual, getting the frames installed took longer than I was hoping for.

That means the mower isn't fixed, the yard isn't mowed, and the face frame on the passenger side isn't installed either. Lol...
Hope your week is off to a great start!
About Motorhome Group
38,769 PostsLatest Activity: Jul 09, 2020