Forum Discussion
fulltimin
Jun 18, 2020Nomad
Added a 1/4" piece of plywood, to the front of the 2 x 3, after cutting 1/4" out of there, so the plywood fit flush with the rest of the 2 x 3.
Also added a piece of 1/2" thick plywood to the rear of the 2 x 3, and glued both of them in place, along with screws, and clamps. Left my brace in place to keep the counter level, and we'll wait until tomorrow and see how it looks after pulling the brace out.
If I need to, I can add a "leg" under that section to help support it.

That's the "quick" version tonight. I am beat and going to bed.
Also added a piece of 1/2" thick plywood to the rear of the 2 x 3, and glued both of them in place, along with screws, and clamps. Left my brace in place to keep the counter level, and we'll wait until tomorrow and see how it looks after pulling the brace out.
If I need to, I can add a "leg" under that section to help support it.

That's the "quick" version tonight. I am beat and going to bed.
About Motorhome Group
38,769 PostsLatest Activity: Jul 09, 2020