Forum Discussion
fulltimin
Sep 23, 2020Nomad
I pulled the other side of the roofing back today. I worked on getting the seam ChemLink sanded off, well, ground off with the grinder and flap wheel.
I now have all the seams leveled off, as well as the ChemLink covering the screw heads.
In this pic the arrow is pointing to an area that I sanded with the orbital sander with 40 grit sandpaper. I did not wipe the dust off before I took the pic.

Is that all I did? Ah, yes. That took a couple of hours. It wasn't a 10 minute job, unfortunately.
Next move is to finish scuffing up the top of the plywood. I hope I can get that done tomorrow, but we'll see.
I now have all the seams leveled off, as well as the ChemLink covering the screw heads.
In this pic the arrow is pointing to an area that I sanded with the orbital sander with 40 grit sandpaper. I did not wipe the dust off before I took the pic.

Is that all I did? Ah, yes. That took a couple of hours. It wasn't a 10 minute job, unfortunately.
Next move is to finish scuffing up the top of the plywood. I hope I can get that done tomorrow, but we'll see.
About Motorhome Group
38,769 PostsLatest Activity: Dec 31, 2014