Forum Discussion
pianotuna
Sep 17, 2014Nomad III
Hi,
After blowing 3 charging fuses I replaced it with an automatic circuit breaker.
The OEM solenoid failed with months and I, too, replaced it with a much heavier duty unit. I chose to add a second charging path, so I have redundancy for alternator charging of the house bank.
I do monitor amps going too and from the "house". It's kind of neat to see the solar system sending a bit of power back to the engine.
After blowing 3 charging fuses I replaced it with an automatic circuit breaker.
The OEM solenoid failed with months and I, too, replaced it with a much heavier duty unit. I chose to add a second charging path, so I have redundancy for alternator charging of the house bank.
I do monitor amps going too and from the "house". It's kind of neat to see the solar system sending a bit of power back to the engine.
About Motorhome Group
38,705 PostsLatest Activity: Jan 22, 2025