Forum Discussion
DrewE
Jan 21, 2019Explorer II
hertfordnc wrote:
So is the transfer switch typically set up to default to the generator until it detects shore power?
Typically it's the other way around--the generator has priority over shore power (so it lets shore power through until it detects that the generator is supplying voltage).
About Motorhome Group
38,756 PostsLatest Activity: Oct 11, 2025