Forum Discussion
DrewE
Jan 21, 2019Explorer III
hertfordnc wrote:
So is the transfer switch typically set up to default to the generator until it detects shore power?
Typically it's the other way around--the generator has priority over shore power (so it lets shore power through until it detects that the generator is supplying voltage).
About Motorhome Group
38,766 PostsLatest Activity: Jan 10, 2026