mdbass wrote:
Let's see-we have a production pad under construction, a pipeline going in and our rig. And this is not the first time. We asked Whitsett about it and the laughing was deafening. Someone did call us back and told us not to worry about recording the pipeline or production pad traffic. So that's what we do. IMHO You'll have more luck talking to your account rep as she/he is the one that has to get the expense approved by the company man.
Last summer the gate we were on had 3 rigs drilling, a new pad being built, a pipeline crew using our gate, tankers hauling oil out of the existing production sites, and another frac pond being built on the property!! We got paid for the 3 rigs which was good, but we truly had 24/7 traffic with all the other things going on.