Lynnmor wrote:There is no way to verify concrete meets the requirements of the specs when it is poured. The only way to verify the concrete meets the requirements is to make cylinders at the time of the pour and break them 28 days later.
3. A brand new bridge has concrete that didn't pass inspection and will be completely torn out and replaced. I guess the concrete wasn't inspected at the time it was poured.