Powertour wrote:
Yeah the charge controller I inherited with this setup is a Chinese LMS unit.
I don't see anything in the sparse (key word) documentation that says to avoid having panels wired to the controller unit if you don't have a battery bank wired up/connected at the same time.
From the LMS manual:
Caution: For secure installation, must follow below connect sequence: First battery, second load, and the last photovoltaic panel.
…………………………………………………………………