Here I’ve reinstalled the #2 GA cabling between the SCC’s and the main battery bank buss bars. The exposed buss bar between the controllers is the Negative Buss. The Positive cable between the two circuit breakers is #4 GA as well as the rest of the cabling between the breakers and buss bars on both Line and Load sides.

And here all the above mentioned cabling has been installed.

Here you can see the cabling from the SCC’s going down the right side. That’s all #2 GA as I mentioned above. I twisted it to hopefully cancel any EMI that maybe coming from the Charge Controllers.

and here the main buss bar wiring has been completed

and here the controllers are closed up. The controllers are Morningstar, TriStar - MPPT - 60 Amp
here’s a link
TriStar MPPTThere’s a little loose wiring on the right side. That will be completed once the garage lighting is installed and beavertail control wiring is completed.