Forum Discussion
MEXICOWANDERER
Jul 18, 2015Explorer
Be prepared for a very sensitive pot adjustment.
Out of the box look on the right side panel for an indented slide switch. Make sure it is selected for the lower of the two AC line voltage settings. Once things get settled in, I recommend squirting a spotch of black silicone sealant into the 120vac connections. Set the PS up off the deck or vertical mount with the fan on the high side. But keep the bottom up. I used short metric thread nylon standoffs but short metal metric screws with flat heads will work just as well this will keep the bottom ventilation ports free and clear.
Out of the box look on the right side panel for an indented slide switch. Make sure it is selected for the lower of the two AC line voltage settings. Once things get settled in, I recommend squirting a spotch of black silicone sealant into the 120vac connections. Set the PS up off the deck or vertical mount with the fan on the high side. But keep the bottom up. I used short metric thread nylon standoffs but short metal metric screws with flat heads will work just as well this will keep the bottom ventilation ports free and clear.
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,205 PostsLatest Activity: Feb 23, 2025