Forum Discussion

CA_Traveler's avatar
CA_Traveler
Explorer III
Dec 26, 2014

First Solar Harvest

Comments appreciated

3x250W serial connected panels, flat mounted (4 degree slope), no shadows on 12/24/14 in Oceanside, CA (33.2117° N) and MS MPPT 60 controller. There were high clouds by 10am and variable clouds for the remainder of the day. Batteries were fully charged at the start so DC loads were added that exceeded the controller output during the day.

Solar harvest was 113 AH for the day. Does this seem like a ball park harvest considering the short days, low sun elevation and clouds?

Controller Amps Output


Panel Specs

About Technical Issues

Having RV issues? Connect with others who have been in your shoes.24,191 PostsLatest Activity: Jan 19, 2025