Canadian_Rainbi
May 23, 2017Explorer
Replacing Xantrex Prosine 2,0 Recommendations
The third Prosine 2.0 inverterd/charger has died.
Very little room near batteries. SEE PIC
since then in electric bay below the charger is the SC 2030 solar controler and shunt for the Trimetric 2030 monitor.
Need +/- 100A charging and easy to set charge parameters. (4 X 6V GS, 480 AH total)
2KW PSW
Could go separate charger and transfer switch but where to put them?
Recommendations?
Very little room near batteries. SEE PIC
since then in electric bay below the charger is the SC 2030 solar controler and shunt for the Trimetric 2030 monitor.
Need +/- 100A charging and easy to set charge parameters. (4 X 6V GS, 480 AH total)
2KW PSW
Could go separate charger and transfer switch but where to put them?
Recommendations?