Forum Discussion

pianotuna's avatar
pianotuna
Nomad III
Apr 20, 2013

semi full time no generator

Hi all,

May 1, 2013 I'll be semi full timing (a minimum of a week per month--and sometimes much more). I intend to attempt to do this with no generator use, and opportunity 15 amp shore power (though most often shore power will not be available).

Weather conditions in Regina, SK are such that in winter I'll be experiencing months of temperatures well below freezing. Probably November through March there may be few days that climb above that magic 0 C (32 F).

There are no dump sites that are open year round here.

I've tried to prepare my class C as much as is possible, but I'm open to any constructive comments.

190 Replies

About Technical Issues

Having RV issues? Connect with others who have been in your shoes.24,341 PostsLatest Activity: Dec 07, 2025