Forum Discussion
JimK-NY
May 12, 2017Explorer II
The way the system was installed I cannot access or change the wiring without trying to remove the solar panels. I believe the prewiring from Northstar was 10 gauge. I have no idea how long the wiring run is. It looks like it would need to be 10 - 15 feet.
What does the IPN do? I thought that was used to manage multiple controllers.
What does the IPN do? I thought that was used to manage multiple controllers.
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,362 PostsLatest Activity: Mar 02, 2026