Forum Discussion
pianotuna
Dec 27, 2014Nomad III
Hi b.,
Depending on the controller the order would be
1. connect battery bank
2. connect panels
For shutting down reverse the order.
Depending on the controller the order would be
1. connect battery bank
2. connect panels
For shutting down reverse the order.
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,344 PostsLatest Activity: Mar 27, 2025