NRALIFR
May 17, 2015Explorer
You can say that again! Hope to take them out in a few weeks if work doesn't get in the way.
Got 2/3's of the upper bay ceiling done today. I worked with the guys pulling lights and garage door supports down, then putting them all back up. I fabricated a temporary support for the garage door tracks and motor that would allow us to remove the supports from the ceiling one section at a time. You can see part of it hanging from the far left support beam, ready to support the last door track when they come back.

The white sheetrock reflects the light so much better that it's noticeably brighter now.

I think they're going to earn their money doing the lower bay. The 16 ft. ceiling is going to require renting a scissor lift.
:):)
Got 2/3's of the upper bay ceiling done today. I worked with the guys pulling lights and garage door supports down, then putting them all back up. I fabricated a temporary support for the garage door tracks and motor that would allow us to remove the supports from the ceiling one section at a time. You can see part of it hanging from the far left support beam, ready to support the last door track when they come back.

The white sheetrock reflects the light so much better that it's noticeably brighter now.

I think they're going to earn their money doing the lower bay. The 16 ft. ceiling is going to require renting a scissor lift.
:):)