Forum Discussion
j-d
Oct 01, 2014Explorer II
Working on a similar Fleetwood Hybrid, a 1999 Terry UltraLight 721. Those of you who "floored over" with a new layer of 1/2" plywood - Where did you Stop? How did you treat the Bathroom/Toilet? Did you remove furniture or just work up to it? At this point, I'm thinking of removing the front U-shaped seating/table/sleeping are and flooring over that are wall to wall. Then down through the kitchen area, just floor up to the existing sink and fridge cabinets. That still leaves the What To Do With The Bath? Question.
THANKS!
THANKS!
About Travel Trailer Group
44,029 PostsLatest Activity: Jan 21, 2025