I don’t have one of those jigs but I am using lots for glue and screws. Over all I think there is enough good material left in the structure to reuse the bulk of the roof and the walls. I had originally planned on just repairing the floor but due to the amount of glue I decided I would probably do more damage trying to take it apart that it was worth. Starting from scratch on a second unit might be a better way to go but I think repairing this unit is the best way to go at this point.
I did get the floor frame together and glued, as I said in a previous post the process has slowed significantly. I’m hoping to get the outer plywood mounted this week, then putting the insulation in and buttoning it up

