The process continues. Like I said in an earlier post I got the outer floor on, glued and screwed down.
Got the floor frame flipped and filled with the foam insulation
Then I put the inner flooring on, got most of it trimmed tonight.
I have one more piece to trim then I’ll pull it all back off, put the glue on all the support and screw it all back together.
The biggest challenge is the fact I had to double up the ¾” foam insulation but the 2x2s aren’t quite an inch and a half, so the floor is a bit “fluffier” than the frame, so there will be lots of glue and screws to hold it tight until everything settles in.