Forum Discussion
CAJW
Jun 13, 2014Explorer
robsouth wrote:
A fridge can take as much as 24 hours to cool down. If you put anything in it that was not already cool, it can take longer. Mine takes at least 12 hours to reach temps and then I load with stuff that has already been refrigerated. Maybe you have just not waited long enough. Usually if the freezer is working well, the fridge will also as there is only one cooling unit for both.
That's the plan, since I have no other. Normally this unit is quick to cool down and within a few hours, it's down in the mid 40's. I agree, if the freezer is working, the fridge should be as well. Guess I'm spoiled to a quick cool down, so in the morning I'll either find it cool or will be loading an ice chest up. Thanks for the feedback and hope your right.
About Travel Trailer Group
44,027 PostsLatest Activity: Mar 05, 2025