wnjj wrote:
How about adding a 5-6' long fill off the back end of the slab? Then back the trailer so the wheels are off the concrete and onto the level fill. Your trailer will be further away from where you back your car too.
It's part of the long term plan. Just don't know when we'll have the extra cash to make another pad. We'd have to bring in more dirt then framing, then the concrete. Bad part is my dirt slope goes from each side of my property, so I'd need to figure out how to get the cement 150' from the street :) I wouldn't let them bring a cement truck on my driveway.