When I got there at midday the roof platform ribs were in place stapled and glued in place. 0.75 " at center, with a 2' flat running the whole length and sloped at each end (fore and aft). Then sloped to the edges with ribs following the current roof rib pattern.




Cover by 3/8" OSB, glued and screwed into place. Dave measured each hole and cut them out and they all matched...I have issues doing one.:R
In one sheet he had four to hit and each was on center!!!:B

He even gets them in place alone...needs no help...I do not offer, don't want to slow him down.

[img]

[/img]
Getting ready to set the next board...221 on all ribs.


I was able to get some bubble insulation in places that covered wire holes and runs. Some of the places had no insulation form the factory...they just dig out the white beadboard and do whatever...very sloppy. The improved insulation plus the new air space created by the new sloped roof will add some R-value...ANYTHING HELPS in an RV!!!

Last sheet for the day. The wire sticking up in front of his knee is the new RG-6 coax for the Tailgater...he will install a roof fitting to plug and screw on into from the sat dish, which will sit behind the AC unit.
