Pantry baskets all cleaned painted and new floor ready to go back in.

Had to get a new slide for the bottom as the old one when removing fell apart and the plastic slide broke and ball bearing everywhere. This one is so smooth.

TV Cab lining going in and door has been reinofrced to hold the flat panel LCD on a swing arm.
Installing new fan in hood.

Solder and shrink wrap.

Made a seal gasket from closed cell urethane sheet get that from packing material I got a while ago...knew that it would be handy one day.

Hood installed.

Modified the bulb holder to have the flat array parallel with the cover lens.


LED TEST: Hood only

Over sink and hood

Entry door step light above the new shoe cubby.

When ordered the new SS stove top the DW wanted one of the new covers.


Should be able to just toss in washer and keeps everything clean...we'll see!
Reinstalled my insulation package in the wire cubby.


It is just a tin box that backs onto tthe bath sink area...every bit of insulation pays off!
Reinstalled my closet insulation pack as well. It worked before it should do it again.

Linen closet.
