GdeTrailer wrote:
Then there is the build time.. Something on this magnitude of scale is going to eat a lot of man hrs, building a one off like this you could be looking at 3 months – 6 months of build time in a small shop.
:E I'm planning on 2 month build time plus or minus a week or 2 at the end of the summer. The longest build time of anything is the Corian counter top (they need a 6 week lead time to manufacture). I plan to furnish the builder with specific items that would save some time and not limit me to their selection such as the mattress, the shower panels, the swivel chair, etc. In the last week of the build I'll buy the truck. When it rolls off the lot I'll spend about 2 weeks at a camp ground near the factory (probably the only time I'll see a campground for that length of time) to shake it down and then head west.