Forum Discussion
mbrower
Feb 15, 2016Explorer
Old-Biscuit wrote:
For 7 yrs. we set up/torn down our 5vr weekly.
I ran driven legs down from travel position a couple of inches then pulled the snap pins letting inner leg fall to ground (12X12 plastic 1/2" cutting boards under each leg)
Then would run driven legs down letting the pins snap into holes when they lined up and start lifting 5vr.
For me it was K.I.S.S.
This is exactly how I do it. Never a problem
About Fifth Wheel Group
19,006 PostsLatest Activity: Jan 13, 2025