1. Unplug RV from external power.
2. Gain access behind the RV service/breaker panel where the 30 or 50 amp cord enters.
3. Choose a spot to mount the Prog Indust control box near the service panel. (But don't mount it yet)
4. Cut the 30/50amp cord(This is the part where it's kinda important to be unplugged from shore power!) at a point long enough to reach the PI box with another foot to spare for terminations inside the box and maybe some extra to be able to pull it out and easily work on it.
5. Terminate the shore power side first to make it easy to work on. (Follow manuf directions)
6. Terminate the service panel side next.
7. Install cover.
8. Plug the data cord for the remote display in(if it has that option).
9. Test everything before mounting it to the permanent spot.
2. Gain access behind the RV service/breaker panel where the 30 or 50 amp cord enters.
3. Choose a spot to mount the Prog Indust control box near the service panel. (But don't mount it yet)
4. Cut the 30/50amp cord(This is the part where it's kinda important to be unplugged from shore power!) at a point long enough to reach the PI box with another foot to spare for terminations inside the box and maybe some extra to be able to pull it out and easily work on it.
5. Terminate the shore power side first to make it easy to work on. (Follow manuf directions)
6. Terminate the service panel side next.
7. Install cover.
8. Plug the data cord for the remote display in(if it has that option).
9. Test everything before mounting it to the permanent spot.