OK Troy I'll bite....what are you talking about? If you referring to the lug weld station, that line has been moved. The "Control Plans" as we call them are kept in a document book in or close to the operators work station. BTW we do not have "machinist" at our plant. We have operators, CNC Techs and Team leaders for production. In our machine trades we have Tool & Die Technicians but again no machinist.
As far as QC of his parts he has a spider gage that checks the lug location in relationship to the pilot/hub. The operators chack all four stations at the start of the shift then again every 100 parts. They are also checked randomly by a floor inspector 4 times a shift and every finished skid is checked before it ships out.
Don
As far as QC of his parts he has a spider gage that checks the lug location in relationship to the pilot/hub. The operators chack all four stations at the start of the shift then again every 100 parts. They are also checked randomly by a floor inspector 4 times a shift and every finished skid is checked before it ships out.
Don
About Travel Trailer Group
44,030 PostsLatest Activity: Jan 21, 2025