coolmom42 wrote:
....between Shelby, MT and Chester, MT, near Galata.
10+ miles of bare dirt and gravel, steep dropoff on shoulders, one-lane delays (2) with traffic lights, and generally a huge, bone-jarring, down to 5 mph MESS.
It appears that the road is being widened to 4 lanes, for some mysterious reason. But the original road surface is GONE.
Not much equipment working---at the current rate, I don't see how it will get done this summer.
No big deal, no different than Pa. signs saying road work next 32 mi., cones and barrels set up, reduced speed limit, and no work being done, not even a worker in site, or Virginia that blocks of a lane for 10 mi for 2 years, to do a 6 month job. ;)