Forum Discussion
meinook
Jul 18, 2017Explorer
I'm almost finished with the Sketch Up design, the trailer is striped to the frame and I'm still trying to figure out the blog process.
I bought the windows, door, torsion hinge, 4 cargo doors and the underbelly fabric last weekend. Next up is removing the old load door springs, wire wheel and paint the rust areas before building the sub-floor.
I bought the windows, door, torsion hinge, 4 cargo doors and the underbelly fabric last weekend. Next up is removing the old load door springs, wire wheel and paint the rust areas before building the sub-floor.
About DIY Maintenance
RV projects you can tackle on your own with a few friendly pointers.4,352 PostsLatest Activity: Jan 20, 2025