Rv furnace discharge plenum has openings where flexible duct work is connected. The flexible duct work is then run to the various registers and connected.
They can fall off at either end
The duct work can be kinked
The duct work can be mashed
CFM for a 35000 BTU furnace is typically 375
Also obstructions on return air side of furnace can reduce air flow
They can fall off at either end
The duct work can be kinked
The duct work can be mashed
CFM for a 35000 BTU furnace is typically 375
Also obstructions on return air side of furnace can reduce air flow