Sea_Six
Jul 12, 2014Explorer
New RV concrete pad - how long until I can park on it?
5" pad, 12,000 pound fifth wheel.
This is a place to park the camper at my house. I'll use it as an extra bedroom for visitors and for occasional overnight stays, "just 'cause." :)
I added a 3" sewer connection, a 30 amp power pole with a separate 20 amp line, with an underground electrical conduit big enough to pass a double 50 amp lines should I ever decide to upgrade the electric service. I even ran an RG - 6 tv cable out there.
Can't wait to park my rig on it, set out a couple of chairs and start enjoying it!
Question: How long would you wait for the concrete to cure?
This is a place to park the camper at my house. I'll use it as an extra bedroom for visitors and for occasional overnight stays, "just 'cause." :)
I added a 3" sewer connection, a 30 amp power pole with a separate 20 amp line, with an underground electrical conduit big enough to pass a double 50 amp lines should I ever decide to upgrade the electric service. I even ran an RG - 6 tv cable out there.
Can't wait to park my rig on it, set out a couple of chairs and start enjoying it!
Question: How long would you wait for the concrete to cure?