lawrosa wrote:
I ordered my non slide coachmen and missed the build dead line. I had to wait 5 months or so longer..
They build two times a year basically. slide and non slides. ( AFAIK)
Any custom orders as mine with a 10% deposit get built first. Mine was first off the line and delivered pretty fast.
They build these so fast your bound to have issues. I hope you dont but mine was huge in faults.
LP leak
Short on main batt wire to converter
Trap not hooked up at shower flooded bathroom
Pieces of wood and garbabage in underbelly and stuffed behind stove
And still a furnace that goes off on high limit.
A missing heating duct.
Etc etc etc..
Sounds like a typical 'Amish Craftmanship' build to me. I had the P trap issue in my unit as well, but I caught it before the shower flooded the floor. Never tightened the compression fitting and it came off the drain pipe. Would have been a helluva mess. As it was. my nebsihing around inside and taking off panels and checking stuff caught it.
Only issue actually. Could have been a disaster however.