Forum Discussion
Calisdad
May 27, 2014Explorer
There are blade fuses in the panel. I'm putting the DVM on either side of the removed fuse.
If 500 milliamps = 1/2 amp would it not take 8 days (12 amps a day) to run down a 100ah battery (tho things would quit working long before that)?
No refer switch that I can find. There is a small 14" x 14" solar panel that I suppose was intended to offset this draw.
If 500 milliamps = 1/2 amp would it not take 8 days (12 amps a day) to run down a 100ah battery (tho things would quit working long before that)?
No refer switch that I can find. There is a small 14" x 14" solar panel that I suppose was intended to offset this draw.
About Motorhome Group
38,767 PostsLatest Activity: Mar 12, 2026