Forum Discussion
mike_brez
Jun 11, 2014Explorer
Going from memory the hole in the bottom of the A arm is 1-1/4-1-1/2 inch diameter. The disks go on the top and bottom of bags. Remove schrader valve from new bags then soak news bags in very hot water. Roll bags up tightly and zip tie every four or five inches. Make shure hole in A arm and upper and lower seating areas are clean. Spray bags and A arm with soapy water and work bag up into spring. Cut zip ties and insert upper and lower pucks.


About Motorhome Group
38,756 PostsLatest Activity: Dec 17, 2017