Update on my 2021 Forest River 3010DS that is being built.
Ordered 8/8/2021.
Will come off assembly line 9-17. Then 3/4 weeks for full body paint. The factory says the supply of parts is the biggest holdup due to the virus.
Actually i am very happy with the progress.
I will get the coach just in time to do my first winterize :) LOL
No honestly i am very fine with the dates and progress. It will have one 100w solar panel done at the factory, and then once it arrives at the dealership i am adding 2 more 100w panels. The controller can handle up to 5 100w panels.
Our first camping experience will be Skyline Drive starting at Front Royal VA.
Jimbo
Will come off assembly line 9-17. Then 3/4 weeks for full body paint. The factory says the supply of parts is the biggest holdup due to the virus.
Actually i am very happy with the progress.
I will get the coach just in time to do my first winterize :) LOL
No honestly i am very fine with the dates and progress. It will have one 100w solar panel done at the factory, and then once it arrives at the dealership i am adding 2 more 100w panels. The controller can handle up to 5 100w panels.
Our first camping experience will be Skyline Drive starting at Front Royal VA.
Jimbo