Forum Discussion
MattR
Aug 19, 2009Explorer
My wife and I have been finishing up a bunch of the projects we have been working on, including:
Bamboo countertop
New Sink
Painting Oven/Walls/Cabinents
Replaced electrical outlets/covers


Replaced lower cabinet doors and drawers with bamboo

Upgraded stove lighting with LEDs & replaced fluorescent lights with LEDs


Installed our magnetic strip from Ikea

Added a place to hang our keys

Fabricated and painted stairs up to our RV

Almost done with the shelving/seating unit we're making. We've added the doors but still need to made the cushion for the middle seating area and put in shelves in the end (for shoes).

I think I'm going to do part two of my Instructable on turning fluorescent fixtures into LEDs (dressing it up in bamboo and acrylic).
Bamboo countertop
New Sink
Painting Oven/Walls/Cabinents
Replaced electrical outlets/covers
Replaced lower cabinet doors and drawers with bamboo
Upgraded stove lighting with LEDs & replaced fluorescent lights with LEDs
Installed our magnetic strip from Ikea
Added a place to hang our keys
Fabricated and painted stairs up to our RV
Almost done with the shelving/seating unit we're making. We've added the doors but still need to made the cushion for the middle seating area and put in shelves in the end (for shoes).
I think I'm going to do part two of my Instructable on turning fluorescent fixtures into LEDs (dressing it up in bamboo and acrylic).
About Motorhome Group
38,708 PostsLatest Activity: Mar 05, 2025