Forum Discussion
Canadian_Rainbi
Aug 03, 2013Explorer
Well to be truthful, what the tech did!
1: Replaced the transfer switch. Direct replacement no longer available so had to replace some cables. The old one was becoming intermittent and sometimes wouldn't switch back to shore power when the gen was turned off.
2: Redid the mounting of the solar panels: ALL the screws showed rust, some seriously rusted. Two had pulled out out of the roof because the *%&(^ UNtech who mounted them had used straight long angle brackets on a curved roof!
Since they all had to come out and be redone, had him make them tiltable 4 ways and moved a bit so that in the future the 2 80 watt panels can be replaced with 130s to match the other two. Lots of screw holes to be filled! Pics one of these days!
3: Also had him mount a swing arm bracket for the led TV. Now I just have to finish the cabinet shelving and hope the satellite receiver cables reach the new location!
1: Replaced the transfer switch. Direct replacement no longer available so had to replace some cables. The old one was becoming intermittent and sometimes wouldn't switch back to shore power when the gen was turned off.
2: Redid the mounting of the solar panels: ALL the screws showed rust, some seriously rusted. Two had pulled out out of the roof because the *%&(^ UNtech who mounted them had used straight long angle brackets on a curved roof!
Since they all had to come out and be redone, had him make them tiltable 4 ways and moved a bit so that in the future the 2 80 watt panels can be replaced with 130s to match the other two. Lots of screw holes to be filled! Pics one of these days!
3: Also had him mount a swing arm bracket for the led TV. Now I just have to finish the cabinet shelving and hope the satellite receiver cables reach the new location!
About Motorhome Group
38,769 PostsLatest Activity: Jul 09, 2020