Forum Discussion

nvreloader's avatar
nvreloader
Explorer
Apr 06, 2014

Best Way??

I have 4-Canadian SC6P-220w Panels with the following spec's,
Pmax=220W
Voc =36.60V
ISC =8.09A
VMP =29.30V
Imp =7.52A
Voc-coef =0.1281V/C
Noct =45.00C
15A fuse rating/series

Per actual measurement of the roof/dimensions, the farest run of the panel cables (10ga/MC4 connectors) will be 15/20' max into the area where the controller, a Tristar-MPPT-60a,w/ battery temp gage will be mounted.

Should I run all 8 cables (4 panels) down the reefer vent area into the electrical bay and tie them into a neg/pos buss bars, then run WHAT sized wire to the controller??

Is there a better/easier way, to route all these panel wires?

I am taking this in small steps, so I can understand it.

Tia,
Don

About Technical Issues

Having RV issues? Connect with others who have been in your shoes.24,190 PostsLatest Activity: Jan 24, 2025