He, wife, dog and two cats headed back to Sn Miguel de Allende. The tough part was the base mounting. He purchased a pair of 5" cube blocks of ironwood. Palo Fiero. Used a rasp to contour the bottom to the roof. Drilled a pair of 3/4" holes. He borrowed my NutSert tool and a to 3/8" X 24 stainless nutserts for the roof. Scratched the fiberglass and drilled 1/8" holes for a place to grab the GOOP and he drilled a few dozen very shallow 1/8" pilot holes in the blocks and left the surface roughened with a grinder disc. Control switch to defeat high beam operation.