The recommended order of connection is:
Battery bank --> controller --> solar panels. This allows the controller to "set" itself to the correct voltage.
The recommended order for disconnection is:
Solar panels --/ controller --/ battery bank
Battery bank --> controller --> solar panels. This allows the controller to "set" itself to the correct voltage.
The recommended order for disconnection is:
Solar panels --/ controller --/ battery bank