Forum Discussion
wca01
Aug 01, 2014Explorer
If it is schedule 40 steel pipe, the OD is 6.625: and the ID is 6.031:
Then the correct equation for schedule 40 pipe is:
(6.031 / 2)^2 * pi * 600 * 12 / 231 = 890.408
Good Luck!
Wil
Then the correct equation for schedule 40 pipe is:
(6.031 / 2)^2 * pi * 600 * 12 / 231 = 890.408
Good Luck!
Wil
About Technical Issues
Having RV issues? Connect with others who have been in your shoes.24,193 PostsLatest Activity: Jan 26, 2025